Showing posts with label Project Management. Show all posts
Showing posts with label Project Management. Show all posts

Sunday, 19 June 2016

Construction Program - Gantt Chart

The Brief

Produce a detailed construction program (Gantt chart) for a small office building in

Bryanston as part of a Project Management application using Project Libre.

Contract Description:

The building consists of the following s:
400m² Basement Parking & Storage
300m² Ground Floor Offices, Reception, Conference Facilities & Ablutions
250m² First Floor Offices & Ablutions
50m² Loft Offices (Timber Roof structure with Dormer Windows)

The Structure should consist of a concrete frame with panels of plastered brickwork. The
windows and shop-fronts are to be timber. The site conditions necessitate piling.
Site Handover is to take place on 1 July 2015. It is absolutely imperative that this contract
reaches final completion before 1 December 2015.

The following should be considered:
Public Holidays
Realistic Durations
Detailed breakdown of tasks
Provision for inclement weather (delays because of rain or cold)


Gantt Chart

Project Management - Critical Path Diagrams

This assignment during my BTech course required me to draw up Critical Path Diagrams for Project Management.

Below is the brief and  my answers:













Sunday, 19 October 2014

Contemplation Space

The Brief:

The theme for this brief was TOPOGRAPHY/TOPOLOGY_grown from the earth, hung from the sky. 
We as students were expected to engage with the notion of duality. 
Topography- a reference to the earth, landscape and the physical, Topology - the science and expression of space, meaning and the intangible. 
The scheme must respond to the internal and external realms of the site and provide a space for
contemplation, viewing, dwelling, comfort and shelter.

The site was situated in Melville Koppies Nature Reserve, Johannesburg.