Sunday, 19 June 2016

Construction Program - Gantt Chart

The Brief

Produce a detailed construction program (Gantt chart) for a small office building in

Bryanston as part of a Project Management application using Project Libre.

Contract Description:

The building consists of the following s:
400m² Basement Parking & Storage
300m² Ground Floor Offices, Reception, Conference Facilities & Ablutions
250m² First Floor Offices & Ablutions
50m² Loft Offices (Timber Roof structure with Dormer Windows)

The Structure should consist of a concrete frame with panels of plastered brickwork. The
windows and shop-fronts are to be timber. The site conditions necessitate piling.
Site Handover is to take place on 1 July 2015. It is absolutely imperative that this contract
reaches final completion before 1 December 2015.

The following should be considered:
Public Holidays
Realistic Durations
Detailed breakdown of tasks
Provision for inclement weather (delays because of rain or cold)


Gantt Chart

No comments:

Post a Comment